Since the late 1980's upgrading of railway bridges has been made a much simpler process with the development of the Furphy Bridge Deck. Pressed in 6 or 8mm steel plate and then hot dip galvanized these decks can replace existing timber decking with installation times as low as overnight for a whole bridge.
The decks are pressed to a trough profile with overall depth ranging from 100mm to 175mm.
![]() |
| A Deck and balast plate section being lifted into place on the Avon River railway bridge. |
![]() |
| Galvanized bridge deck sections ready for delivery. |
Railway Bridge Decking

